First demonstrator jacket with composite joints takes shape
The first demonstrator jacket with our composite joints takes shape!
On October 14 at HSM Offshore Energy, we witnessed a milestone: the structure rolling up for the very first time. With the joints carefully wrapped for protection during assembly, what once lived in drawings has become a jacket structure — a proud moment for our team.
Next up: We get to see it standing tall and then onto load testing with TU Delft.
This isn’t just a jacket. It’s proof that offshore wind can be built faster, with less steel, and at lower cost. If you’d like to learn more or explore opportunities, we’d love to connect.
